The Victoria Bridge is a bus and pedestrian bridge over the Brisbane River joining the south bank and the CBD, Brisbane. The current bridge, opened in 1969, is the third permanent crossing erected at this location. Freyssinet was engaged by Acciona Construction, a part of a collaborative partnership with Brisbane City Council and Arup, to complete design and construct strengthening works of this bridge to accommodate the modified carriageway layouts, potential shade structure and the urban utilities suspended below bridge in readiness for being used as part of a new Brisbane Metro system.

  • General Contractor
    ACCIONA Construction Australia Pty Ltd
  • Customer/Owner:
    Brisbane Metro
  • Engineer
    ARUP
  • Freyssinet Subsidiary
    Freyssinet (QLD)
  • Works period
    August 2022 - April 2025

Freyssinet Scope

Design elements:

  • Post-tensioned system 4 multi-strand tendons
  • Tendon anchorage blisters, and deviators
  • UHPFRC Blisters inc. Prototypes and testing

Installation and testing:

  • Supply of all materials and components
  • Installation of post tensioned strand and bar tendons
  • All blisters, deviators, ducting and strands
  • Grouting of tendons
  • Suspended Scaffold install
  • Reinforcement identification / scanning
  • Coring of holes through the existing bridge webs and soffit.