- Completed repairs on immersed wharf piles using dry abrasive blasting and airless spraying, with all works carried out via boat access using custom-designed platforms.
- Maintained environmental protection during tidal works while working around ship movements.
- Conducted spot repairs on the SR02 stacker reclaimer boom structure and tripper car areas using power tool cleaning and brush/roller application, with access via elevated work platforms (EWP), mobile scaffolds, and walkways.
- Performed large spot repairs around the bucket wheel area using abrasive blasting and airless spraying.
- Delivered a high-quality coating system for the full scope of work during a 10-day outage with a 24/7 work schedule.