Supplied, erected, and removed scaffold deck suspended under the jetty to enable safe access.
-
Performed soffit patch repairs with hydro-demolition to ~140mm depth to reach sound concrete and expose reinforcement.
-
Replaced deteriorated reinforcement, including all welding and fabrication.
-
Installed a hybrid cathodic protection (CP) system to prevent future corrosion and tied-on sacrificial anodes to protect adjacent areas.
-
Designed CP grid (600mm x 300mm, 425mm spacing) tailored to site conditions.
-
Optimised anode sizing for 85-year design life at 1mA/m², protecting up to 600mm² of steel per unit.
-
Applied concrete using a mix of form-and-pour and shotcrete methods.
-
Completed works amid ongoing shipping activity and in hazardous areas (e.g., ammonia zone).
-
Rehabilitated concrete beams with hydro-demolition, steel installation, CP, and concrete pours.
-
Used specialised micro-concrete for beam reconstruction.
-
Navigated tidal movement using suspended scaffold access beneath the jetty.