- Freyssinet Australia were engaged as the post-tensioning contractor for supply and install of all slab and floating block wall hoop tendons.
- Assistance was provided at the design stage to utilise the floating block system c.f. buttress anchorages.
The local Council needed to construct a second reservoir next to an existing one such that at a later stage the existing reservoir could undergo remediation works. A new 4Ml in-situ concrete tanks was built and incorporated a post tensioned slab and walls utilsing the floating block design (typically used for precast tank construction). This was design change to the conventional buttress anchorage originally designed.