Eden Wharf, a multipurpose naval facility also serving local stakeholders, required strategic remediation to ensure its long-term performance. Constructed in the early 2000s, the wharf is a critical maritime asset. Freyssinet was engaged to deliver targeted repair and strengthening works, extending the structure’s service life by an estimated 25 years.

  • Customer/Owner:
    Department of Defence
  • Engineer
    N/A
  • Works period
    August 2024 - March 2025

Freyssinet Scope

  • ICCP works to the wharf
  • Upgrade of fire water emergency system
  • Underwater welding works to structural elements
  • Marine remediation works including protective coatings and concrete repair
  • Provision of alternative design solutions to extend asset life, including ICCP detail modifications and specification of longer-lasting, environment-suited materials