- Removal of deteriorated concrete through high- pressure water blasting, achieving the required surface profile for adhesion.
- Replacement of steel reinforcement.
- A modular BluSeal Anchor Knob system was secured to formwork and grouted into place to ensure full mechanical bonding.
- Works completed in a confined space, requiring optimised formwork design and extensive liner welding preparation.
- Comprehensive quality assurance, including visual and mechanical inspections of all welds.
Freyssinet was engaged to refurbish the XXXX Castlemaine Brewery trade waste sump, enhancing its corrosion resistance against the acidic byproducts of beer production. As one of Queensland’s most iconic breweries, XXXX Castlemaine has been operating at its Milton site for over a century, playing a key role in the state’s brewing heritage. A key challenge was working within a confined space, with access limited to a single manhole for both personnel and material entry—including formwork—requiring careful planning and execution.
-
General ContractorFreyssinet Australia Pty Ltd
-
Customer/Owner:Castlemine Perkins
-
EngineerN/A
-
Works periodJuly 2024 - December 2024
Freyssinet Scope
Discover our range of markets
You have a project?
Our local experts will help you achieve your project thanks to our large range of solutions.
Contact us
You have a project?
Our local experts will help you achieve your project thanks to our large range of solutions.
Contact us