- Removal of deteriorated concrete through high- pressure water blasting, achieving the required surface profile for adhesion.
- Replacement of steel reinforcement.
- A modular BluSeal Anchor Knob system was secured to formwork and grouted into place to ensure full mechanical bonding.
- Works completed in a confined space, requiring optimised formwork design and extensive liner welding preparation.
- Comprehensive quality assurance, including visual and mechanical inspections of all welds.