The Bayswater Station project forms a critical part of Perth’s METRONET program, aimed at improving rail connectivity and supporting future network expansion. The works involved constructing a new station and associated rail infrastructure, including complex bridge components to accommodate increased passenger capacity. The project required advanced structural solutions to ensure durability, safety, and compliance with stringent engineering standards. Key challenges included maintaining operational rail services during construction and integrating post-tensioned girders with precision to achieve long-term performance. These measures were essential to minimize disruptions while delivering a robust and future ready transport hub.

  • Customer/Owner:
    Public Transport Authority (PTA)
  • Engineer
    BG&E
  • Works period
    August 2021 - January 2024

Freyssinet Scope

  • Freyssinet was responsible for delivering key structural works on the Bayswater Station project.
  • Executing post-tensioning works on the piers and precast main girders
  • Grouting the joints between
  • Supply and install of bearings and shock transmission units (STUs).

These activities were critical to ensuring structural integrity and long-term performance of the bridge components.