- Protective coating to all white elements of the structures totalling 60,000 sqm2, with 70,000 sqm worth of steelwork recoated using 25,000 litres of epoxy paint applied in a 4-coat system
- In order to remove the corrosion of the 1136 steel members of the roof, 88 T of blasting sand was used
- Concrete repair works
- Strengthening works and column encasement
- Louvres and cladding replacement to the façade