- Supply & Install 30 structural steel trusses (4-6 tonne each)
- Core existing concrete columns – 1000mm deep, 77mm diameter – 576 off
- Supply & Install M50 Freyssibar through each 77mm core hole – 16t total
- Supply & install two staircase towers
- Design and install temporary works system including access and jacking for installing structural steel