- Supply of all fork‑to‑fork stay cable components including 19‑strand and 12‑strand configurations.
- Prefabrication of 16 stay cables:
- 10 × 19‑strand (over‑blocked wedge design, H1000)
- 6 × 12‑strand (extrusion swage design, H2000)
- Installation of all 16 stay cables (craneage by CBGUJV).
- Stressing of stay cables to design force and anchorage close‑out following approval of stressing results.
- Contract Variations Included:
- Supply and tensioning of D50 Freyssibars at pylon bases during installation.
- Completion of outrigger grouting