Freyssinet was engaged to undertake remediation of deteriorated culverts beneath Nudgee Road in Brisbane, as part of critical infrastructure renewal works. The project spanned two sites—Pound Drain and Cannery Creek—comprising both rectangular and circular culverts. While the core focus was on structural remediation, the works also required stakeholder coordination, traffic & public impact minimisation, and dewatering support provided by Epoca.

  • General Contractor
    Freyssinet Australia Pty Ltd
  • Customer/Owner:
    Epoca Constructions Pty Ltd
  • Engineer
    N/A
  • Freyssinet Subsidiary
    Freyssinet Australia (QLD)
  • Works period
    September 2021 - May 2022

Freyssinet Scope

  • Concrete repairs
  • Supply and installation of all grouting works
  • Supply and installation of Cathodic Protection
  • Coffer Dam Installation
  • Traffic Management
  • RPEQ Certification (Form 16) to ensure all works had been constructed in accordance with Cathodic Protection drawings and details
  • Carbon fibre strengthening works (Quakewrap Systems)