Freyssinet was engaged to deliver the refurbishment of two sections of the above-ground pipeline at the Mt Crosby East Bank Water Treatment Plant. The scope includes the design, supply, and installation of tailored work platforms and full encapsulation at each work location—enabling safe and efficient blasting and recoating of the pipeline infrastructure.

  • General Contractor
    Freyssinet Australia Pty Ltd
  • Customer/Owner:
    Seqwater
  • Engineer
    N/A
  • Freyssinet Subsidiary
    Freyssinet Australia (QLD)
  • Works period
    September 2024 - Current

Freyssinet Scope

  • Refurbishment (blast & paint) of all above ground pipework at two locations, including   provision of access as well as some concrete repairs around the pipeline areas.
  • In addition the bearing pads for Pipeline saddles are made of Absestos and will require appropriate treatment to ensure they are also refurbished and protected in line with industry standards for handling Asbestos.
  • Approximately 280LM of Pipeline Works close to 1400m2 of Surface Area for portion 1.
  • Approximately 170LM of pipeline for a total of 160m2 of Surface area to be refurbished for portion 2.