- Excavation and removal of the existing concrete collar to expose the turbine foundation.
- Precision drilling to locate and access cavities at the bottom flange of the steel column.
- Injection of hydrophilic resin to fill voids and seal around the embedded can, reducing tower movement.
- Installation of a new concrete collar to improve drainage and direct water away from the tower base.
- Application of the Triflex Towersafe waterproofing system to protect the interface between steel and concrete.
- Backfilling and compaction of the surrounding area.