- Concrete removal with hydro demolition
- Concrete and reinforcement reinstatement via form and pour and shotcrete
- Installation of impressed current cathodic protection system and anode replacement of existing anode system.
Routine condition assessments were conducted on the structure in previous years and determined that remediation works are required to the structure.
BHP has undertaken an extensive remediation project from 2015 onwards to restore the Berth 2 caisson columns to enable a further 40-year serviceable design life. Including a capital improvement package to install a Cathodic Protection (CP) system to the columns to ensure the durability of the structure for the future 40-years.
-
General ContractorFreyssinet Australia Pty Ltd
-
Customer/Owner:BHP / BM Alliance Coal Operations Pty Ltd
-
EngineerInfracorr Consulting Pty Ltd
-
Freyssinet SubsidiaryFreyssinet Australia (QLD)
-
Works periodNovember 2020 - August 2021
Freyssinet Scope
Discover our range of markets
You have a project?
Our local experts will help you achieve your project thanks to our large range of solutions.
Contact us
You have a project?
Our local experts will help you achieve your project thanks to our large range of solutions.
Contact us