Routine condition assessments were conducted on the structure in previous years and determined that remediation works are required to the structure.

BHP has undertaken an extensive remediation project from 2015 onwards to restore the Berth 2 caisson columns to enable a further 40-year serviceable design life. Including a capital improvement package to install a Cathodic Protection (CP) system to the columns to ensure the durability of the structure for the future 40-years.

  • General Contractor
    Freyssinet Australia Pty Ltd
  • Customer/Owner:
    BHP / BM Alliance Coal Operations Pty Ltd
  • Engineer
    Infracorr Consulting Pty Ltd
  • Freyssinet Subsidiary
    Freyssinet Australia (QLD)
  • Works period
    November 2020 - August 2021

Freyssinet Scope

  • Concrete removal with hydro demolition
  • Concrete and reinforcement reinstatement via form and pour and shotcrete
  • Installation of impressed current cathodic protection system and anode replacement of existing anode system.