- Concrete repairs on a mine site during a shut-down period
- Removal and Replacement of concrete including saw cutting and hydro-demolition as well as concrete reinstatement with formwork and reinforcement to various sections.
- Localized concrete repairs, with installation of galvanic anodes, to the ROM2 Hopper Vault and Transfer Station