- Manufacture 8 Train plates and 5 Tongue plates under stringent quality criteria and hold points.
- Remove damaged joints and perform thorough cleaning for seamless installation.
- Install two-part Demag joints (Tongue plate and Train plate) with precision.
- Apply elastic sealing around joint perimeters to prevent dust ingress.
- Execute replacement works within 4 nightshifts, minimizing traffic disruption.
- Collaborate with traffic management teams to ensure a safe work zone.
- Utilize adequate lighting and mobile plant for efficient operations.