The Causeway Link Pedestrian & Cyclist Bridges consists of 2-off cable stay steel bridges, the McCallum Park Bridge and the Point Fraser Bridge, which together along with overland approach paths will link Perth CBD to McCallum Park via Heirisson Island.

The bridges are supported by stay cables that are attached to steel pylons that in turn are supported by pile caps in the river. There are 2-off pylons for the McCallum Park Bridge and 1-off pylon for the Point Fraser Bridge.  17 000 lights are installed at the stays, turning the bridges into enormous LED screens and dominant city attraction at nighttime.

  • General Contractor
    Causeway Link Alliance
  • Customer/Owner:
    Main Roads
  • Engineer
    WSP
  • Freyssinet Subsidiary
    Freyssinet Australia (WA)
  • Works period
    November 2023 - December 2024

Freyssinet Scope

  • Designed, supplied, and installed 64 stay cables across two bridge structures

  • Developed and implemented a bespoke LED lighting system integrated into the stay cables

  • Produced and installed the custom lighting for enhanced aesthetic and functional impact

  • Supplied and installed expansion joints to support structural movement and durability