This project involves the remediation of combustible cladding on residential apartment buildings in Mascot, delivering a safer, code-compliant façade solution. Works include the safe removal of non-compliant Aluminium Composite Panels (ACP) and associated façade elements, followed by the installation of fully compliant cladding systems in line with current design specifications and building regulations.

  • General Contractor
    Freyssinet Australia Pty Ltd
  • Customer/Owner:
    The Owners – Strata plan 145 / Hansen Yuncken
  • Engineer
    N/A
  • Works period
    April 2024- June 2025

Freyssinet Scope

  • Remove existing ACP panels and any non-compliant façade components
  • Installation of new, compliant cladding panels as per design specifications and regulations
  • Site establishment, access design/installation and provision of material hoist
  • Cantilevered roof scaffold and balcony/mobile scaffold
  • Provide and install a material hoist for vertical transport of materials
  • Works performs using scaffold platforms, rope access methods, and Elevated Work Platforms (EWP) 
  • Dismantling of access systems, site demobilisation, and area cleaning
  • Access is carefully managed using a combination of scaffolding, rope access, and Elevated Work Platforms (EWPs), ensuring minimal disruption to residents.